Construction partner awarded bid for Madison`s first purpose-built men’s shelter


Construction partner awarded bid for Madison`s first purpose-built men’s shelter


The City of Madison has awarded Miron Construction the bid to build what will become the first-ever purpose-built men’s shelter in Madison.  

Miron submitted the low bid of $21,463,884 plus an 8% maximum construction contingency of $1,717,111, for a total of $23,180,995.

The shelter, which will be located on Bartillon Dr., is a collaboration between the City of Madison, Dane County, and Porchlight, Inc., the local non-profit chosen to be its operator. Funding for the project includes $13.5 million from City sources, including $8 million of borrowing, $10.5 million from Dane County, and $3 million of federal funds, including $2 million from a Congressional earmark secured by Congressman Mark Pocan.  

The 40,000-square-foot facility will have the capacity to house 250 men experiencing homelessness in a space specifically designed to meet their needs...




   ...more

Ken Notes: Speaking of ROI, this project works out to 84K and 160 SQ FT for each of the 250 residents. It is a great facility and much needed but couldn`t we serve more people by stick building small/tiny homes in a neighborhood/village setting. A hand up rather than a hand out. I like this project...

Share this article on you social outlets



Our Sponsors
- - Volume: 24 - WEEK: 28 Date: 7/10/2024 11:58:41 AM -